The house is still coming along. When we were there this weekend, the major thing that has been done since my last update was paint – although it wasn’t completely finished. They’ve also fixed some minor things we pointed out with the cabinets (for instance we wanted one of the cabinets to be hinged on the opposite side). They installed the laminate counter for utility room sink and the cultured marble counters in the secondary bathrooms (although they are the wrong color).
I believe they are still figuring out what to do about the cabinet stain for the maple cabinets since they were supposed to be getting us a new sample and we haven't heard from them. I’m guessing the granite counter tops won’t be installed until after that is done. I think they are also about to do the fireplace. There was a picture of what it’s supposed to look like hanging on the wall when we were there this weekend.
They’ve currently given us an estimated closing date of December 28th, which is later than we were hoping. However, we don’t want to rush them and we’ll certainly need to make sure everything is complete before we close.
No comments:
Post a Comment